中文
English
轮播多图
自由容器
PREFABRICATED RUBBER RUNWAY ROLLS
自由容器
IAAF CERTIFIED PRODUCTS
INVENTION PATENTED PRODUCT
THREE-STAR PRODUCT OF SYNTHETIC MATERIALS FOR PRIMARY AND SECONDARY SCHOOL SPORTS FACILITIES
自由容器
自由容器-副本1
(Strictly implement the new national standard GB 36246-2018)
自由容器-副本1-副本1
Features of Prefabricated Coil Products
Super friction and grip, even in wet weather, still perform well
The surface process is formed at one time, with special anti-skid texture to ensure the safety of users;There is no need to worry about falling off of particles that will reduce the anti-slip performance.
自由容器-副本1-副本1-副本1
Excellent shock absorption and resilience
The structure design of the wear-resistant layer and the shock-absorbing layer combines shock-absorbing performance and energy return (rebound) performance to ensure that users will not be fatigued during long-term training, and ensure the safety of users to the greatest extent. Especially for non-professional athletes, it is even more important.
自由容器-副本1-副本1-副本1-副本1
Factory prefabricated, product quality is fully controllable
The thickness of the prefabricated runway is constant, and the production environment is fully controllable. There is no need to worry about the  of the on-site operating environment causing the quality of the final product to reach the design level. In addition, the constant thickness ensures that the performance of every point in the runway area will not be lower than the requirements of track and field sports.
自由容器-副本1-副本1-副本1-副本1-副本1
The best tear resistance, can withstand higher point loads in a variety of applications
The prefabricated rubber sheet has excellent tensile properties, even if it is laid on the concrete base layer, it will not cause the surface layer to crack due to the plastic cracking of the concrete. When events are held in the venue, it can also ensure that the venue is not easily damaged under effective protection.
横向标签
Prefabricated coil production equipment
Prefabricated coil production scene
自由容器
Prefabricated Coil Engineering Case